Master
'
s Thesis 2006
FACHHOCHSCHULE
HOCHSCHULE F
U
R
LI Hui
STUTTGART
TECHNIK
Conclusion
STUTTGART UNIVERSITY OF APPLIED
SCIENCES
4
Conclusion
4.1
Usability testing
It is very necessary to evaluate the performance of the client after the development.
Other WMS server and different map data will be tested on the client.
The client was tested on one real mobile device, because the codes debugging on the
special simulator, for example, S60 platform, is complex and time consuming, several
parts of the codes should be modified to adapt to the special criterion of the mobile
devices.
4.1.1 Test with SVG image WMS Server
Load the client, Figure 27 shows the Welcome wait splash and the About description
of the client
.
Fig. 27:
Loads client, Welcome wait splash, About description
First the vector image based WMS was chosen, and connect to the www.gis news.de,
then the wait splash is displaying during the connection. In the
Input the X and Y
coordinate please
Form input point coordinate and then connect to WMS again to
send GetCapabilities request, and the wait splash displays also during the sending.
The information below the Form is server software and content type information of
WMS. See Figure 28.
51
PHP MySql Web Hosting Design and Implement Client Applications PHP MySQL Hosting
|
|
|
|
TotalRoute.net Business web hosting division of Vision Web Hosting Inc. All rights reserved. |